August 3, 2021 Some More Concrete and a Round Window They poured another load of concrete behind the addition this morning.
They are waiting for the engineers to provide exact elevations for the exit driveway and sidewalks.
The pillars that will stand to each side of the front door are primarily decorative.
The outdoor units that will sit behind the addition and pull heat from the air and transfer it to a fluid.
Note the second less prominent sprinkler head placed above the ceiling in case the fire runs up above.
There will be glass railings across the front, and around the two bump-outs at the big window and by the transom window above the south sanctuary door.